xCase Studies

Building Case StudiesRoofing Case Studies

Kay Rowe Nursery

Client: London Borough of Newham Happe Contracts is pleased to announce the completion of another prestige roofing installation for the London Borough of Newham. The contract was for the replacement of the existing failed roof covering at Kay Rowe Nursery, Forest Gate. Happe Contracts installed over 600sq.m. of Radmat Eshaflex high performance felt roofing system, …

Posted in All Case Studies, Roofing Case Studies | Comments Off on Kay Rowe Nursery

Belmont Street

Happe Contracts is pleased to announce the completion of its most recent contract, a new Green Roof for a residential block on Belmont Street, London Borough of Camden. The contract was to remove the existing roof covering and structural decking, and replace it with a Bauder XF118 Wild Flower Blanket. Ostensibly this might seem to be a straightforward task, but before the green covering could be laid…

Posted in All Case Studies, Roofing Case Studies | Comments Off on Belmont Street

Bromley Civic Centre

Happe Contracts installed 2000sq.m of Delta Waterproofing Everflex Plus system incorporating 100mm rigid insulation and new triple skinned rooflights…

Posted in All Case Studies, Roofing Case Studies | Comments Off on Bromley Civic Centre

Woodfield School

The existing felt roof covering was leaking in several places. The solution was the installation of a Tor Elastaseal system incorporating new insulation and over 25 triple skinned roof lights…

Posted in All Case Studies, Roofing Case Studies | Comments Off on Woodfield School

Ware Museum

When the roof of Ware’s historic museum started to fail, IKO Permaphalt polymer modified asphalt was chosen as the waterproofing solution…

Posted in All Case Studies, Roofing Case Studies | Comments Off on Ware Museum

Kent Terrace London

As part of a refurbishment project at one of London’s historic Nash Terrace houses, Delta Ecofin TPO membrane was specified to provide the waterproofing solution…

Posted in All Case Studies, Roofing Case Studies | Comments Off on Kent Terrace London

Wallsgrove House Essex

Over 20,000 machine-made clay plain tiles were installed with ornamental leadwork to this listed building in the heart of an Essex conservation area…

Posted in All Case Studies, Roofing Case Studies | Comments Off on Wallsgrove House Essex

Henniker Road

Bauders Total roof system incorporating FATE insulation was installed to over 1000sq.m of flat roofs with a 20-year guarantee issued on completion…

Posted in All Case Studies, Roofing Case Studies | Comments Off on Henniker Road

Channel 4 headquarters

The existing roof covering to four stairwell roofs had started to fail. Due to the unusual design and many difficult penetrations it was decided to install a Tor Elastaseal system…

Posted in All Case Studies, Roofing Case Studies | Comments Off on Channel 4 headquarters

Richmond Business School

Happe Contracts secured the contract to provide a new roof covering for The Richmond Business School. The project was a total re-roof of the building, involving the removal of the existing slate roof covering and replacement with new Eternit ‘Rivendale’ synthetic slates…

Posted in All Case Studies, Roofing Case Studies | Comments Off on Richmond Business School

Belmont Street

Happe Contracts is pleased to announce the completion of its most recent contract, a new Green Roof for a residential block on Belmont Street, London Borough of Camden. The contract was to remove the existing roof covering and structural decking, and replace it with a Bauder XF118 Wild Flower Blanket…

Posted in All Case Studies, Roofing Case Studies | Comments Off on Belmont Street

Bromley Civic Centre

Happe Contracts carried out the complete internal refurbishment of Bromley Council’s headquarters. The works included electrical, partitioning, decoration and flooring…

Posted in All Case Studies, Building Case Studies | Comments Off on Bromley Civic Centre

University of Hertfordshire

The refurbishment of laboratory E100 included electrical, decoration and flooring works in liaison with various nominated specialist subcontractors…

Posted in All Case Studies, Building Case Studies | Comments Off on University of Hertfordshire

Newham Voids

The contract involved a complete internal and external refurbishment, including new heating, rewiring, structural repairs and decoration to five dilapidated properties…

Posted in All Case Studies, Building Case Studies | Comments Off on Newham Voids

Dukes Place London EC3

Our contract required the external repair and cleaning of the Portland Stone facade at our clients’ London Headquarters…

Posted in All Case Studies, Building Case Studies | Comments Off on Dukes Place London EC3

Wickham Common Primary School

Happe Contracts has recently completed an extension to the Wickham Common Primary School for the London Borough of Bromley. The 280sqm. project has greatly improved the schools teaching facilities…

Posted in All Case Studies, Building Case Studies | Comments Off on Wickham Common Primary School